Sr.
Project Scheduler / Planner
Creating
and executing detailed project schedules for 25 years in the electric
generation (nuclear & fossil) and electric distribution industry, and
supporting design engineering programs for DoD. Working with single and
multiple engineering and construction disciplines to develop integrated
master schedules, resource loaded and leveled, and logically linked for
critical path analysis.
Maintain
project status with periodic updates appropriate for project maturity,
complexity and customer requirements. Utilize established rules-of-credit
standards for adjusting percent complete and producing consistent
performance metrics. Communicate and collect schedule updates as needed
through status meetings, email and documentation, and project site visits.
Provide
schedule data exports to project manager and other PMO functions as needed
to support various reports and metrics.
Professional
Background:
Industries: Electric
Distribution Construction, Maintenance, Smart Grid Development; Electric
Generation Fossil and Nuclear Construction and Maintenance; DoD Program
Scheduling.
Professional
Experience:
Sr.
Planner / Scheduler – B&W mPower (employee) January 2012 – Present
Duties:
Develop and maintain program schedule for multiple engineering functions
within a team of onsite and remote planners. Perform weekly schedule status
updates, maintain changes to live and baseline schedule as design changes
occur, breakdown high level summary activities into detail activities.
Level resources according to availability and fiscal budget. Create
project, function and deliverable metrics for senior management
reviews.
Sr.
Project Controller – BGE (employee) June 2008 – February 2012
Duties:
Smart Grid Program - Manage multiple integrated P6 project schedules for
implementing and completing Smart Grid Program. Create project WBS and
establish activity planning and performance criteria. Analyze resource
loading for realistic profiles and adherence to project resource and cost
plan. Develop EV reports for system and disciple performance analysis.
Monitor key milestones and critical path. Audit P6 Web Timesheet
submittals.
Project
Controller
– Electric Distribution: Create and maintain portfolio of project and
program schedules based on estimates for electric substation and
distribution system – Maintain project schedule accuracy according to
design and scope changes – Perform systematic status updates obtained in
project status meetings and site visits – Maintain enterprise portfolio of
projects and programs essential for annual and multi-year forecast.
Program
Scheduler
- Northrop Grumman (employee) October 2004 – June 2008
Duties:
Create and maintain Microsoft Project schedules for various programs within
the Electronic Systems Sector. Work with Team Leads to create detailed
resource loaded activities necessary to achieve contract scope and
deliverables. Integrate schedule segments into the integrated master
schedule. Track Program Deliverables. Communicate with Contract and
Financial functional areas to maintain program integrity and configuration
control. Provide resource output data for financial input to
develop/forecast cost and resources and roles. Develop performance
measurement reports in MS Project and Excel for SPI / CPI reports and
burn-down graphics. Coordinate meetings with team leads for updating
project status. Support Program Management for monthly status reporting.
Lead
Project Supervisor – Constellation Energy (employee) 1981 - 2004
Duties:
Manage labor, material, equipment for maintenance and construction of
fossil and nuclear electric generation plants. Lead team to plan/execute
activities of the project schedule. Lead daily meetings to communicate
safety issues, project status, daily plan. Communicate project status to
Work Control Center. Monitor and insure safety procedure compliance.
Institute and monitor quality requirements and procedures. Project Estimator/Scheduler
(1986 - 2001) Develop labor estimates according to project scope
documents and WBS. Create project schedule (Primavera P3) organized by WBS
with linked activities and resource loaded. Incorporate material
deliveries, special equipment and key milestones. Create and utilize linear
resource profiles for securing project labor needs. Create detailed
activity work schedules for daily status meetings. Provide project metrics
for monthly performance reports.
Training / Skills:
Trained in Primavera P3
& P6; MS Project 2003; MS Excel, Outlook, Word
Earned Value
analysis; Critical Path analysis
Safety training in
industrial work areas
Teamwork environment
with open communications for problem solving and innovative thinking.
|